New Eni Headquarters (Milan)

Task

Structural design, production and assembly of the steel structures for the various buildings and connecting bridges.

  • Location

    Milan

  • Designer

    SCE Project

  • Client

    CDE - Salini-Impregilo e Lamaro Appalti

  • Technical Characteristics

    Steel installed in place: (tons) 3,500 3.500

contacts

Let's plan the future together

Indietro