Construction of a lower-level truss railway bridge Construction of a lower-level truss railway bridge

Construction of a lower-level truss railway bridge

Lecce Stadium Lecce Stadium

Lecce Stadium

Structures for the grandstand roofing of the Ettore Giardiniero Stadium in Lecce

Matarrese Ghedi Matarrese Ghedi

Matarrese Ghedi

Steel structures for the construction of a hangar in Brescia

Amplia Forlì Amplia Forlì

Amplia Forlì

Cor-Ten steel structures for bridges and overpasses on the new Forlì ring road.

Cociv Genoa Cociv Genoa

Cociv Genoa

Railway bridge on Via Ferri in Genoa

CMB Business Symbiosis CMB Business Symbiosis

CMB Business Symbiosis

Steel structures for the Symbiosis Business District office building

Cossi Cossi

Cossi

RAILWAY OVERPASS for IRICAV2

Manzoni Bridge Manzoni Bridge

Manzoni Bridge

Cor-Ten steel structures for the fourth bridge alongside the Manzoni Bridge

Padua Bridge Padua Bridge

Padua Bridge

Tramway truss bridge over the Scaricatore Canal in Padua

Torrefaro Torrefaro

Torrefaro

FARO Towers Redevelopment Structures – Milan

Metro Blu Metro Blu

Metro Blu

Steel structures for the construction of the metal deck and cladding for the San Cristoforo cycle/pedestrian walkway

University of Malta Facilities University of Malta Facilities

University of Malta Facilities

Steel structures for an office building in the Novoli area of ​​Florence. Steel structures for an office building in the Novoli area of ​​Florence.

Steel structures for an office building in the Novoli area of ​​Florence.

Viaducts and overpasses – New Casalpusterlengo bypass Viaducts and overpasses – New Casalpusterlengo bypass

Viaducts and overpasses – New Casalpusterlengo bypass

Construction of a lower-level truss railway bridge

  • Location

    Bozzolo - Mantova

  • Designer

    ITALCONSUL – LOMBARDI – F&M

  • Client

    La Bozzoliana S.c.a.r.l.

  • Technical Features

    Construction and detailed design, workshop construction and assembly of painted steel structures for the construction of a 70-metre span lattice railway bridge, double track on the Ducale Canal, doubling of the MILAN – MANTUA LINE, CODOGNO - MANTUA SECTION. Steel supplied on site 1,000 tons.

Visualizza

Lecce Stadium

Structures for the grandstand roofing of the Ettore Giardiniero Stadium in Lecce

  • Location

    Lecce

  • Designer

    TECH Project – MJW ​​Eng. Massimo Majowiecki

  • Client

    Consorzio Stabile Build S.C.a r.l.

  • Technical Features

    The roofing consists of an outer ring of hollow lattice beams resting on pendular uprights (metal columns), an inner metal ring suspended and tensioned by load-bearing cable beams, and a PVC finishing sheet. Steel supplied on site: 1,700 tons.

Visualizza

Milan Fair

  • Location

    Milan

  • Designer

    Structures: Arch. Francesco Marzullo

  • Client

    Fondazione Fiera Milano

  • Date

    in progress

  • Technical Characteristics

    Structures for the construction of four long-span lattice girders, positioned on site to replace the 12 internal columns of pavilions 13 and 15 at Fiera Milano RHO. Steel supplied on site: 1400 tons. Work carried out as a temporary consortium.

Visualizza

Matarrese Ghedi

Steel structures for the construction of a hangar in Brescia

  • Location

    Brescia

  • Designer

    STRUCTURES: Construction project by MBM

  • Client

    Materrese spa

  • Technical Features

    Construction and detailed design, workshop fabrication, and assembly with lifting of large, three-dimensional mesh structures; plan dimensions: 60 x 60 meters. Steel supplied on site: 1,000 tons.

Visualizza

Amplia Forlì

Cor-Ten steel structures for bridges and overpasses on the new Forlì ring road.

  • Location

    Forli

  • Designer

    STRUCTURES: SETECO

  • Client

    AMPLIA – Baraldini Quirino

  • Technical Features

    Detailed and construction design, workshop fabrication, and assembly with launching of the Cor-Ten steel structures for the construction of a bridge over the Rabbi River, as well as the Partigiano and Placucci viaducts with metal pre-stressed beams. 3,000 tons of steel supplied on site.

Visualizza

Cociv Genoa

Railway bridge on Via Ferri in Genoa

  • Location

    Genoa

  • Designer

    STRUCTURES: Eng. Paolo Costa Medich

  • Client

    COCIV

  • Year

    Under Construction

  • Technical Features

    Construction and detailed design, workshop construction and assembly of steel structures for the construction of a double-track railway bridge with lower lane. Steel supplied on site 500 tons.

Visualizza

CMB Business Symbiosis

Steel structures for the Symbiosis Business District office building

  • Location

    Milan

  • Designer

    STRUCTURES: Jacobs Italia spa

  • Client

    CMB

  • Date

    Under Construction

  • Technical Features

    Office building consisting of staggered buildings 15 levels above ground. Steel supplied on site 700 tons.

Visualizza

Cossi

RAILWAY OVERPASS for IRICAV2

  • Location

    San Martino - Verona

  • Designer

    STRUCTURES: Eng. Renato Vaira – Studio Corona

  • Client

    Cossi spa

  • Year

    Under Construction

  • Technical Features

    Construction and detailed design, workshop construction and assembly assistance for two railway overpasses: Steel supplied on site: 700 tons

Visualizza

Manzoni Bridge

Cor-Ten steel structures for the fourth bridge alongside the Manzoni Bridge

  • Location

    Lecco

  • Designer

    STRUCTURES: Steel Project - Eng. Giovanni Costa

  • Client

    Aleandri spa

  • Year

    Under Construction

  • Technical Features

    Construction and detailed design, workshop construction and assembly with tip launch of the Cor-Ten steel structures for the construction of a bridge consisting of 100-meter free spans and variable-height beams. Steel supplied on site 3,000 tons.

Visualizza

Padua Bridge

Tramway truss bridge over the Scaricatore Canal in Padua

  • Location

    Voltabarozzo - Padua

  • Designer

    STRUCTURES: Steel Project engineer Giovanni Costa

  • Client

    European Stable Consortium

  • Year

    Under Construction

  • Technical Features

    Construction and detailed design, workshop fabrication, and assembly of the painted steel structures for the construction of a bolted lattice viaduct with a 90-meter span over a canal, with a head and forebeam launch. Steel supplied on site: 1,000 tons.

Visualizza

Torrefaro

FARO Towers Redevelopment Structures – Milan

  • Location

    Milan

  • Designer

    Detailed executive project: Studio Capè Ingegneria

  • Client

    CMB - Colombo

  • Date

    Under Construction

  • Technical Features

    The project envisages the construction of a 140-meter-high tower. The steelwork consists of large, partially welded-on-site elements, forming the circular distribution beams over three levels. The steel supplied on site is 800 tons.

Visualizza

Metro Blu

Steel structures for the construction of the metal deck and cladding for the San Cristoforo cycle/pedestrian walkway

  • Location

    Milan

  • Designer

    STRUCTURES: M Engineering Eng. Alberto Miazzon

  • Client

    METROBLU

  • Year

    Under Construction

  • Technical Features

    Galvanized lattice structures covered with painted metal panels. 1,500 tons of steel supplied on site.

Visualizza

Ethiopia Bridge

  • Location

    Ethiopia

  • Designer

    STRUCTURES: Steel Project - Giovanni Costa

  • Client

    Webuild

  • Year

    Under Construction

  • Technical Features

    Construction and detailed design, workshop construction and assembly assistance with top launch of the service bridge on the dam overflow. Steel supplied on site 450 tons.

Visualizza

University of Malta Facilities

  • Location

    Malta

  • Designer

    STRUCTURES: QP Management LTD

  • Client

    Pillow Space Frame Ltd

  • Date

    2023

  • Technical Features

    Complex steel structures for the new Sustainable Living Complex Project

Visualizza

Steel structures for an office building in the Novoli area of ​​Florence.

  • Location

    Florence

  • Designer

    STRUCTURES: Jacobs Italia spa

  • Client

    Paolo Beltrami Construction spa

  • Date

    2023

  • Technical Features

    Office building consisting of two buildings with seven above-ground levels. Usable area 18,000 m2. Steel supplied on site 1,800 tons.

Visualizza
March 1, 2023

Viaducts and overpasses – New Casalpusterlengo bypass

  • Location

    Casalpusterlengo - Lodi

  • Designer

    STRUCTURES: Eng. Renato Vaira – Studio Corona

  • Client

    Aleandri spa

  • Year

    2023

  • Technical Features

    Detailed and construction design, workshop fabrication, and assembly of the Cor-Ten steel structures for the construction of a three-span railway viaduct, three three-span overpasses, and four overpasses. Steel supplied on site: 3,000 tons.

Visualizza