Headquarter
Via Lugagnano, 32 - 37060 Caselle di Sommacampagna (VR)
Work With Us
Ph: +39 045 8580766
Mail: mbm@mbm-vr.it

A1 Bologna – Florence motorway, Lot 3

Task

Mixed steel/reinforced concrete section deck structures. Work completed as the principal of a Temporary Association of Enterprises

  • Location

    Sasso Marconi (BO)

  • Designer

    Seteco Ingegneria S.r.l.

  • Client

    Contractor: Toto S.p.A.

  • Date

    2006 - 2007

  • Technical Characteristics

    Viaducts constructed with welded steel beams (partly constructed in place) of h = 5.5 m, over spans of 100 m. Steel supplied in place: (tons) 3,000.

contacts

Let's design the future together

Indietro