Ponte Alla Navetta (PI)

Task

Bridge with three spans of 80 - 160 - 80 m, constructed in mixed steel/reinforced concrete. Project completed as a Temporary Association of Enterprises

  • Location

    Pontedera (PI)

  • Designer

    Eng. Massimo Viviani

  • Client

    Consorzio Etruria

  • Date

    2008 - 2009

  • Technical Characteristics

    The bridge is constructed as a continuous beam over three spans with a variable height single-cell torsionally rigid caisson with bottom bracing. The structure was assembled by rotating the two pre-assembled halves on the two banks : the half-structure hinged centrally on the middle stack and ballasted on the abutment, was moved on special circular slides by stringing strands until it was cantilevered exactly over the centre of the river. The operation was repeated on the other side, and the deck was installed axially into its final conformation, after which the caisson was completed and welded.