Headquarter
Via Lugagnano, 32 - 37060 Caselle di Sommacampagna (VR)
Work With Us
Ph: +39 045 8580766
Mail: mbm@mbm-vr.it

Bicycle/pedestrian path – Dozza (Bo)

Task

Cable-stayed bicycle/pedestrian path

  • Location

    Dozza (BO)

  • Designer

    Eng. Massimo Majoviecki

  • Client

    Municipality of Bologna

  • Date

    2007

  • Technical Characteristics

    Cable-stayed bridge over motorway, with 100 m clear span. Two "A"-shaped trestles, with a 10 m opening at the base, inclined and contrasted at the centreline, form the main load-bearing system. The variable box sections of the profiles are optimized to follow the stress pattern. The gently curved deck has a minimum width at the centre of 2.5 m, widening to 10 m at the ends. The latter is supported by a system of cables consisting of a series of stays converging at the key and fanning out, which transfer the suspension loads to the centres of the trestles together with the tubular "chains." Assembled by means of launching with motorized trolleys.

contacts

Let's design the future together

Indietro