Eur Towers

Task

Redevelopment works on the 'TORRI DELL'EUR' building complex, phase 1 structural works

  • Location

    Rome

  • Designer

    Detailed executive project: Steel Project

  • Client

    Carron SpA

  • Date

    2023

  • Technical Features

    The project envisions the reuse of the six existing tower buildings, strengthening the reinforced concrete structures with on-site welded metalwork elements and constructing new adjacent buildings entirely from prefabricated steel elements. Steel supplied on site: 6,000 tons.

contacts

Let's design the future together

Indietro