Manzoni Bridge

Cor-Ten steel structures for the fourth bridge alongside the Manzoni Bridge

Task

Construction design, construction and assembly of the load-bearing structures of the fourth bridge for local roads in Lecco

  • Location

    Lecco

  • Designer

    STRUCTURES: Steel Project - Eng. Giovanni Costa

  • Client

    Aleandri spa

  • Year

    Under Construction

  • Technical Features

    Construction and detailed design, workshop construction and assembly with tip launch of the Cor-Ten steel structures for the construction of a bridge consisting of 100-meter free spans and variable-height beams. Steel supplied on site 3,000 tons.

contacts

Let's design the future together

Indietro