Headquarter
Via Lugagnano, 32 - 37060 Caselle di Sommacampagna (VR)
Work With Us
Ph: +39 045 8580766
Mail: mbm@mbm-vr.it

Suspension bridge over the Mangiola stream

Task

Structural design, construction and assembly of the suspension bridge structure over the Mangiola stream

  • Location

    Mulazzo ( MS)

  • Designer

    Eng. Mario de Miranda

  • Client

    I.C.I. Soc. Coop. a r.l.

  • Date

    2019

  • Technical Characteristics

    Two-span suspension bridge (24 + 100 m) with mixed steel/reinforced concrete section deck and central caisson

contacts

Let's design the future together

Indietro