Headquarter
Via Lugagnano, 32 - 37060 Caselle di Sommacampagna (VR)
Work With Us
Ph: +39 045 8580766
Mail: mbm@mbm-vr.it

Two bridges in Gardena Valley (BZ)

Task

Construction of two viaducts for the Santa Cristina Bypass

  • Location

    Santa Cristina (BZ)

  • Designer

    Eng. Organte

  • Client

    Contractor: Oberosler

  • Date

    2008

  • Technical Characteristics

    Continuous COR-TEN beams, bolted, installed from below. Steel supplied in place: (tons) 600

contacts

Let's design the future together

Indietro